Case Study: Wimbledon SW19 Residential Property

The Problem

The existing render was uneven and there was a mixture of brick and render.

The Solution

Install 50mm Kingspan K5 insulation boards and render over the existing render with a lightweight render system. In this case we used K Rend’s Thin Coat system which was TC10.

Job Size

250m2