Case Study: Lea Bridge Road E10 Apartments

The Problem

The existing brickwork looked very uneven and tiered.

The Solution

Apply a K Rend Thin Coat system with full fibreglass reinforcement mesh and base coat over the brickwork. This achieved a uniform finish and the building looked brand new.

Job Size

400m2