Case Study: Walthamstow Academy Sto Render

The Problem

The render had been installed incorrectly by the previous contractor and we had to repair it and overcoat it.

The Solution

We repaired the STO Render and over coated in the Stolit K product as per manufacture specification.

Job Size

1200m2

Year

2014